Pre-Signaled Modified Cloverleaf
From OpenTTD
3-Way junctions
- Basic 3-Way
- Line Merge
- Half Cloverleaf
- Half Spaghetti
- Compact 3-Way
- Compact 3-Way B-M Junction
- Ultimate 3-way
- Half Transmogrified
- Braided Junction
4-Way junctions
- Basic 4-Way
- Roundabout
- Cloverleaf
- Spaghetti
- Star
- Complex Star
- Branch-Merge
- Over-Under
- Tetrathorp
- High Speed 4-Way Fly-over/under
- Pre-Signaled Roundabout
- Advanced Roundabout
- Right-of-way Roundabout
- 4-Way Triple Axial
- 4-Way Triple Axial 2
- Triple Via Mini
- Transmogrified
- Tightlong
- High Hill
Enormous junctions
Other junctions
Unuseful juctions
| Note This needs a better picture |
This is a pre-signaled modified cloverleaf, with the possibility of U turns on special tracks. It's based on the Advanced Main Line Depot which uses pre-signals to give priority to the trains on the main line. The exits from the mail line are before entrances, reducing traffic problems (Fig.1).
Pros:
- Traffic jams less likely.
- Can handle a large number of trains at a time.
- Exits from main line are before entrances, reducing the chance of traffic problems.
Cons:
- Very costly to build.
- Trains must slow down to climb a slope.
- Trains must slow down during sharp turns.
- Trains must turn left to turn right. This could lead to trains getting lost. (Can be fixed by using waypoints).
