Two Tracks
When using a single track for multiple trains between two stations, it may happen that a train must wait for a long time before it can use the track, especially when the track is long. The reason is that only one train is allowed on a single block of tracks to prevent train collisions.
To solve this, you need double tracks so that trains can pass each other in other places than just the station. One way to do that is to add one or more passing sidings and another way is to just double the complete track.
Partly doubling the track: the passing siding
The passing siding is a short section of track that is partly doubled, guarded by signals. It is a cheap solution, but it still allows for delays when trains don't synchronize well enough.
Key to the passing siding is to make it long enough that it can fit the longest train that will use it. Since our platforms are five tiles long, it makes sense to make the passing siding five tiles long as well. Because a signal also occupies a tile, the final result will be somewhat longer.
As for the signals, we'll be using
one-way path signals. You could use two-way path signals, but then in some occasions trains will sneak ahead; the one-way path signals prevent this. Remember that it is important to have enough space for a train to wait at a signal, see the example below.
| |
| A passing siding (click to enlarge) |
If you have a longer track than this example, you can add multiple passing sidings at different places along the route. If this isn't enough to handle all your trains adequately, you need to completely double the track.
Completely doubling the track
In case of a double track, the route has one track for each direction and can handle much more trains this way.
The first step towards doubling the track is basically building a very long passing siding between both stations. This is enough to be able to add the third train, just like with the smaller passing siding.
| |
| Track completely doubled and the third train (click to enlarge) |
This will work for three trains, but now still only one train can go towards the power station and only one train towards the coal mine at the same time. If you have a long track, you want more trains to be able to travel in the same direction at the same time. Now you can add even more parallel tracks, but using signals is far more efficient (and cheaper) here.
So that's what we'll do. Add more signals. For this you can use either of the two path signal types, but because we don't need the path magic for a piece of track without junctions we can also use the most basic signal type. This is the standard block signal and can be found at the very left of the signal selection toolbar:
.
The signal distance (or density) isn't really important here. If you want a somewhat realistic look, choose a signal distance of at least the train length. If you want a slightly higher capacity, place signals very close to each other. In either case it's important to remember to only place a signal where you want a train to wait! In our example you need to count five tiles from either junction and place the signal on the sixth tile. That way, a train waiting at that signal will never block the junction!
Select the signal you want to build and click the tile you want the signal on. The standard block signals are two-way by default. Click the tile with the signal again (with the signal tool active) to make it one-way. Click once more to make it one-way in the other direction. Trains can never pass the one-way standard block signals from the other side. At first this may not be very clear from the signal graphics. However, the block signals are smaller and show a green aspect when there is no train. The path signals are taller and show red until a train reserves a path through the signal. If this is too confusing for you, just use path signals only; the same rules for where to place them apply.
| |
| Double track with intermediate signals. Path signals will also work on these positions (click to enlarge) |
Got this? Great! In this particular example there now is room for six trains (although four trains will work much better, try it yourself!). We have one dedicated track for trains going towards the power plant and a second dedicated track for trains returning to the coal mine. The signals split the track in multiple sections to allow more trains.
Second second platform
We've already built a second platform at the coal mine, but if traffic gets really heavy, you might want a second platform at the power plant as well. The principle is the very same as at the coal mine and you'll certainly be able to build that without further instructions.
| |
| Second platform at power plant station (click to enlarge) |
If the distance between both stations is (much) longer, you should consider adding a depot to the other side of the track as well. If you play with vehicle breakdowns enabled, this provided a second opportunity for trains to be serviced, resulting in less frequent breakdowns.