Quad Branch-Merge Junction

From OpenTTD
(Difference between revisions)
Jump to: navigation, search
Line 10: Line 10:
  
 
[[image:Sharpcorners.PNG|thumb|Figure B.]]
 
[[image:Sharpcorners.PNG|thumb|Figure B.]]
 +
 +
 +
 +
 +
 +
 +
 +
 +
 +
[[Category:Train Junctions]]

Revision as of 22:52, 4 June 2007

Quad Branch Merge Junction


The quad branch merge junction is the direct evolution of the branch merge junction and dual branch merge junction; allowing four entrances and four exits, in essence doubling the appropriation power of a dual branch merge junction. Although still in it's infancy, the quad branch merge junction is able to handle quite a load of large trains (20 cars) with very few backups. (Figure A.)

Figure A.


Speculation of angled track under existing bridges will allow at least a 50% increase in train speed; eliminating eight turns that reduce train speed to below 100mph (161kph) The sharpest turns are illustrated in Figure B.

Figure B.
Personal tools