Quad Branch-Merge Junction

From OpenTTD
Revision as of 23:05, 4 June 2007 by GJockey (Talk | contribs)

Jump to: navigation, search

Quad Branch-Merge Junction


The Quad Branch-Merge Junction is the direct evolution of the Branch-Merge Junction and Dual Branch-Merge Junction; allowing four entrances and four exits, in essence doubling the appropriation power of a Dual Branch-Merge Junction. Although still in it's infancy, the quad branch-merge junction is able to handle quite a load of large trains (20 cars) with very few backups. (Figure A.)

Figure A.


Speculation of angled track in the Nightly builds under existing bridges will allow at least a 50% increase in train speed; eliminating eight turns that reduce train speed to below 100mph (161kph). The sharpest turns are illustrated in Figure B.

Figure B.
Personal tools