- en
- fr
-
Basic 3-Way
-
Line Merge
-
Half Cloverleaf
-
Half Spaghetti
-
Compact 3-Way
-
Compact 3-Way B-M Junction
-
Ultimate 3-way
-
Half Transmogrified
-
Braided Junction
-
Basic 4-Way
-
Roundabout
-
Cloverleaf
-
Spaghetti
-
Star
-
Complex Star
-
Branch-Merge
-
Tetrathorp
-
High Speed 4-Way Fly-over∕under
-
Pre-Signaled Roundabout
-
Advanced Roundabout
-
Right-of-way Roundabout
-
Improved Roundabout
-
Transmogrified
-
Tightlong
-
Deepblue2k8 4-way Junction
-
Multi-way/multi-track cloverleaves
-
Dual Tetrathorp
-
Dual Transmogrified
-
Dual Branch-Merge
-
Quad Branch-Merge
-
Quad Tetrathorp
-
6-tuple Branch-Merge
-
8-Way Star
-
High Speed 4-way
Track Layouts Unuseful junctions
This is a pre-signaled modified cloverleaf, with the possibility of U turns on special tracks. It's based on the Building depots which uses pre-signals to give priority to the trains on the main line. The exits from the mail line are before entrances, reducing traffic problems (Fig.1).
Pros:- Traffic jams less likely.
- Can handle a large number of trains at a time.
- Exits from main line are before entrances, reducing the chance of traffic problems.
Cons:
- Very costly to build.
- Trains must slow down to climb a slope.
- Trains must slow down during sharp turns.
- Trains must turn left to turn right. This could lead to trains getting lost. (Can be fixed by using waypoints).